Steel sheet pile Introduction
Steel sheet pile is most common sheet pile with obvious features such as :high intensity, water-proof property and so on. In bridge construction, u steel sheet pile has gradually played an important role and been popular with engineers. Steel sheet pile from our factory owns the high-class quality, forging by the advanced technology.
The use of steel sheet pile
Sheet pile is a kind of high efficient energy saving building materials.Widely used in embankment, a loading dock, dock, temporary Island, dyke, Luqiao, temporary pier revetment revetment, waterproof cofferdam, river, embankment reinforcement, retaining wall, retaining wall and the construction foundation pit bracing structure of foundation engineering.
Sheet pile has many advantages as following:
1. It combines great profile depth and has excellent statical proerties;
2. It is quite suitable for re-use due to the symmetrical form of the single element;
3. It is possible to assemble the piles into pairs in the factory, this way could improve the quality and performance of installation;
4. Good corrosion resistance performance.
Direction For Use
1) Preparation for construction: Before the pile is driven, the groove at the tip of the pile should be closed to prevent the soil from being squeezed in. The lock should be coated with butter or other grease. For steel sheet piles that have been in disrepair for a long time, whose locks are deformed and whose corrosion is severe, they should be repaired and corrected. The piles that are bent and deformed can be corrected by hydraulic jacking or fire drying.
(2) Division of the piling flow section.
(3) During the piling process. To ensure the verticality of the steel sheet pile. Use two theodolites to control in both directions.
(4) The position and direction of the first and second steel sheet piles to be installed shall be ensured to be accurate so as to function as a guide template. Therefore, every 1m should be measured once, and immediately after hitting the predetermined depth, the steel or steel plate and cofferdam should be used. Bracket welding is temporarily fixed.
Application
WorkShop
Certificate
Steel sheet pile is most common sheet pile with obvious features such as :high intensity, water-proof property and so on. In bridge construction, u steel sheet pile has gradually played an important role and been popular with engineers. Steel sheet pile from our factory owns the high-class quality, forging by the advanced technology.
The use of steel sheet pile
Sheet pile is a kind of high efficient energy saving building materials.Widely used in embankment, a loading dock, dock, temporary Island, dyke, Luqiao, temporary pier revetment revetment, waterproof cofferdam, river, embankment reinforcement, retaining wall, retaining wall and the construction foundation pit bracing structure of foundation engineering.
Sheet pile has many advantages as following:
1. It combines great profile depth and has excellent statical proerties;
2. It is quite suitable for re-use due to the symmetrical form of the single element;
3. It is possible to assemble the piles into pairs in the factory, this way could improve the quality and performance of installation;
4. Good corrosion resistance performance.
Direction For Use
1) Preparation for construction: Before the pile is driven, the groove at the tip of the pile should be closed to prevent the soil from being squeezed in. The lock should be coated with butter or other grease. For steel sheet piles that have been in disrepair for a long time, whose locks are deformed and whose corrosion is severe, they should be repaired and corrected. The piles that are bent and deformed can be corrected by hydraulic jacking or fire drying.
(2) Division of the piling flow section.
(3) During the piling process. To ensure the verticality of the steel sheet pile. Use two theodolites to control in both directions.
(4) The position and direction of the first and second steel sheet piles to be installed shall be ensured to be accurate so as to function as a guide template. Therefore, every 1m should be measured once, and immediately after hitting the predetermined depth, the steel or steel plate and cofferdam should be used. Bracket welding is temporarily fixed.
Application
WorkShop
Certificate